Construction Photos

Rooftop East Expansion Rooftop of East Expansion as of 3/29/12

3rd Floor Lounge Casework in 3rd Floor Lounge as of 3/29/12

Convent showers Updated restroom facilities in the convent 3/29/12

dryer venting Dryer venting 3/29/12

man lift Constructing a man lift at the east expansion 3/29/12

elevator reinforcement Reinforcing steel for the new elevator shaft 3/29/12

vocations office Expanded reception area for vocations office 3/29/12

east entrance New entry for east expansion 3/29/12

coils New heating and cooling coils 3/29/12

library windows New windows for the library 3/29/12

painting trim Painting wood trim 3/29/12

refinished floors Newly refinished floors 3/29/12

ready for finish Wood floors before refinishing 3/29/12

Expansion East expansion as of 3/21/12

expansion East expansion as of 3/16/12

 Expansion masonry East expansion masonry 3/5/12

 Expansion roof Roof of east expansion 3/5/12

 Expansion waterproofing Waterproofing the east expansion 3/5/12

 New entrance at east expansion New entry at the east expansion 3/5/12

 East expansion Exterior of eastern expansion 3/5/12

 Courtyard slate Repairs to the slate in the courtyard 3/5/12

 Courtyard waterproofing Waterproofing in the courtyard 3/5/12

 Elevator shaft New elevator shaft 3/5/12

 1st floor officesGround floor offices 3/5/12

Library track floor Track flooring in the library for moveable shelves 3/5/12

 Library mezzanine New mezzanine level of the library 3/5/12New tunnel Entrance to new tunnel from auditorium to library 3/5/12

casework Casework is reinstalled in renovated rooms 3/5/12student room sink Student room sink 3/5/12wiring installation Installation of new wiring 3/5/12

wood floor Resurfacing wood floors 3/5/12

Board room Board room 3/5/12

Power plant Improvements at the old power plant 2/25/12

East expansion roof East expansion roof 2/25/12

East expansion East expansion 2/25/12

Offices Office framing 2/25/12

East entrance Stairs leading to east expansion 2/3/12

East expansion East expansion rooftop 2/3/12

East expansion East expansion 2/3/12

East expansion East expansion 2/3/12

East expansion East expansion rooftop 2/3/12

Library mezzanine Library mezzanine 2/3/12

sewer work Sewer work 2/3/12

Convent plumbing Improved plumbing in the convent 2/3/12

Tower stone work Tower stone work 1/17/12

Library stairs opening Opening cut for the new library staircase 1/17/12

Library Mezzanine New library mezzanine 1/17/12

 Tunnel to auditoriumTunnel to auditorium 1/17/12

Tuckpointing on the towerTuckpointing on the tower 1/17/12

Student shower Shower base in student restroom 1/17/12

Sprinkler installation Sprinkler installation in an office 1/17/12

Sewer work Sewer work outside the power plant 1/17/12

Soccer field Irrigated, regraded and sodded soccer field 1/17/12

Refectory Work in the refectory 1/17/12

East entrance corridor New entrance by east expansion 1/17/12

East expansion courtyard East expansion courtyard 1/17/12

Downspouts Downspouts in west courtyard 1/17/12

Corridor to the board room Framing in the corridor to the board room 1/17/12

Convent demolition Demolition in the convent 1/17/12

Mockup Mockup of the exterior of the east expansion 1/17/12

Expansion 1East expansion as of 12/8/11

Expansion 2East expansion as of 12/8/11

Expansion 3East expansion as of 12/8/11

Expansion 4East expansion as of 12/8/11

Expansion 5East expansion as of 12/8/11

Expansion 6East expansion as of 12/8/11

Expansion 7East expansion as of 12/8/11New HVACNew HVAC 12/8/11

Convent DemoDemolition at the convent 12/8/11

Entrance 1Entrance drive 12/8/11

Entrance 2Entrance drive 12/8/11

Concrete StagingConcrete staging 12/8/11

Expansion2East expansion as of 11/29/11

Expansion4East expansion as of 11/29/11

Expansion6East expansion as of 11/29/11

Expansion7 East expansion as of 11/29/11

 

Expansion3 East expansion as of 11/22/11

 

Expansion1East expansion as of 11/22/11

Expansion5

 DuctworkNew ductwork in the attic

 Expansion 1

Expansion slab pour 3

Stack tuckpointing 2

 Student room framing 2

 Window painting

Soccer field 2

Ductwork in attic 3

Ceiling removal 3rd floor

Demo of handball courts

 East entrance foundations 2

 East entrance foundations

Excavation for chiller lines 2

Excavation for chiller lines 3

Excavation for chiller lines 5

Excavation spoils relocation

Existing foundation underpinning n. side of expansion

Expansion foundation east wall

Expansion foundations looking southwest

Foundation work new courtyard

Hawk 3

New piping in 4th floor

New piping in attic 2

New plumbing at ground floor development office

North bio-retention construction

Pipe core hole in attic

Piping in attic 7

Piping in attic 8

Plumbing demo 3rd floor

Priest lounge demo

 Priest lounge panelling removal

 Refrectory celing demo

Salvaged casework

2nd floor east room layout work

Soccer field soil stockpile

 Stair demo in library

Steve painting windows

VAV units

Wood floor protectionWood floor protection

 Classroom at boardroomClassroom at boardroom

College classroomCollege classroom

 Expansion prep workExpansion prep work

 Father Rothchild's officeFather Rothchild's office

 Library abatementLibrary abatement

 Library opening to mezzanineLibrary opening to mezzanine

 Mary Beth Witty's officeMary Beth Witty's office

 New tunnel excavationNew tunnel excavation

 New tunnel opening from within libraryNew tunnel opening from within library

 New tunnel opening into libraryNew tunnel opening into library

 RecycleRecycle

 Second floor loungeSecond floor lounge

 Second floor southeast wingSecond floor southeast wing

Stair demo in libraryStair demo in library

Third floor restroom demoThird floor restroom

3rd floor lounge demo3rd floor lounge demolition

Boardroom demo Boardroom demolition

3rd floor debris3rd floor debris chute

RecyclingRecycling old radiators

First Floor CorridorFirst Floor Corridor

First Floor ProtectionFirst Floor Corridor Preparations

Second Floor CorridorSecond Floor Corridor Preparations

Stair ProtectionProtecting the Stairs Prior to Demolition

New EntryNew Entry

Library CleanoutCleaning Out the Libary

Theologate Lounge DemoTheologate Lounge Demolition

Seminarian Room DemoSeminarian Room Demolition