Construction Photos
Rooftop of East Expansion as of 3/29/12
Casework in 3rd Floor Lounge as of 3/29/12
Updated restroom facilities in the convent 3/29/12
Dryer venting 3/29/12
Constructing a man lift at the east expansion 3/29/12
Reinforcing steel for the new elevator shaft 3/29/12
Expanded reception area for vocations office 3/29/12
New entry for east expansion 3/29/12
New heating and cooling coils 3/29/12
New windows for the library 3/29/12
Painting wood trim 3/29/12
Newly refinished floors 3/29/12
Wood floors before refinishing 3/29/12
East expansion as of 3/21/12
East expansion as of 3/16/12
East expansion masonry 3/5/12
Roof of east expansion 3/5/12
Waterproofing the east expansion 3/5/12
New entry at the east expansion 3/5/12
Exterior of eastern expansion 3/5/12
Repairs to the slate in the courtyard 3/5/12
Waterproofing in the courtyard 3/5/12
New elevator shaft 3/5/12
Ground floor offices 3/5/12
Track flooring in the library for moveable shelves 3/5/12
New mezzanine level of the library 3/5/12
Entrance to new tunnel from auditorium to library 3/5/12
Casework is reinstalled in renovated rooms 3/5/12
Student room sink 3/5/12
Installation of new wiring 3/5/12
Resurfacing wood floors 3/5/12
Board room 3/5/12
Improvements at the old power plant 2/25/12
East expansion roof 2/25/12
East expansion 2/25/12
Office framing 2/25/12
Stairs leading to east expansion 2/3/12
East expansion rooftop 2/3/12
East expansion 2/3/12
East expansion 2/3/12
East expansion rooftop 2/3/12
Library mezzanine 2/3/12
Sewer work 2/3/12
Improved plumbing in the convent 2/3/12
Opening cut for the new library staircase 1/17/12
Tuckpointing on the tower 1/17/12
Shower base in student restroom 1/17/12
Sprinkler installation in an office 1/17/12
Sewer work outside the power plant 1/17/12
Irrigated, regraded and sodded soccer field 1/17/12
New entrance by east expansion 1/17/12
East expansion courtyard 1/17/12
Downspouts in west courtyard 1/17/12
Framing in the corridor to the board room 1/17/12
Demolition in the convent 1/17/12
Mockup of the exterior of the east expansion 1/17/12
East expansion as of 12/8/11
East expansion as of 12/8/11
East expansion as of 12/8/11
East expansion as of 12/8/11
East expansion as of 12/8/11
East expansion as of 12/8/11
East expansion as of 12/8/11
New HVAC 12/8/11
Demolition at the convent 12/8/11
Entrance drive 12/8/11
Entrance drive 12/8/11
Concrete staging 12/8/11
East expansion as of 11/29/11
East expansion as of 11/29/11
East expansion as of 11/29/11
East expansion as of 11/29/11
East expansion as of 11/22/11
East expansion as of 11/22/11

New ductwork in the attic
Excavation for chiller lines 2
Excavation for chiller lines 3
Excavation for chiller lines 5
Existing foundation underpinning n. side of expansion
Expansion foundation east wall
Expansion foundations looking southwest
New plumbing at ground floor development office
North bio-retention construction
Priest lounge panelling removal
2nd floor east room layout work
New tunnel opening from within library
New tunnel opening into library
First Floor Corridor Preparations
Second Floor Corridor Preparations
Protecting the Stairs Prior to Demolition




















































